Boliden Zn-valimo
The concrete floor of the Boliden foundry building in Kokkola was replaced.
Size
300 m2
Location
Kokkola
Contract
Total contract
Duration
1 month
Ready
2015
Subscriber
Boliden Oy
WasaCon Kokkola worked in shifts to replace the concrete floor of Boliden's zinc foundry.