The concrete floor of the Boliden foundry building in Kokkola was replaced.

Size

300 m2

Location

Kokkola

Contract

Total contract

Duration

1 month

Ready

2015

Subscriber

Boliden Oy

WasaCon Kokkola worked in shifts to replace the concrete floor of Boliden's zinc foundry.